Feedstock Strategy

Matching technology to the feed, not the other way around.

High-Solids / Crop Residues

Dry digestion / Plug Flow + robust pretreatment

Wet / Slurry Feeds

CSTR / multi-stage wet digestion + stable feed conditioning

Variable Mixed Feeds

Feed-specific hybrid architecture + blend control

Rule: first define the contractual feed envelope; then define the guaranteed plant output.

Availability

Source mapping, seasonality, competing use and contractual control.

Quality

TS, VS, moisture, ash, C:N, sulphur, contaminants and BMP.

Logistics

Collection radius, bale / slurry handling, storage loss and delivered cost.

Guarantee Basis

Blend window, exclusions, feed quantity and quality envelope for PGTR.

Multi-feed does not mean one digester fits every feed.

01
Map Sources

Annual availability, seasonality and competing use

02
Test Quality

TS / VS, moisture, ash, BMP and contaminants

03
Model Logistics

Collection radius, storage loss and delivered cost

04
Freeze Blends

Operating windows, exclusions and recipes

05
Guarantee Output

CBG, recovery, utilities and availability against feed envelope

The hidden risk: theoretical biomass is not bankable feedstock. Practical recovery, logistics and competing uses determine whether a plant can perform every day.

1000-Acre Screening · Top Five Indicative CBG Outputs

Crop / ScenarioUsable Feed (TPD)CBG (TPD)
Hybrid Napier365.196.395
Sugarcane incl. mill residues27.562.594
Oil Palm11.800.906
Coffee Pruning11.310.838
Tapioca / Cassava11.230.604

Indicative screening only — detailed project sizing requires local yield, recoverable fraction, delivered-cost, storage, BMP and competing-use validation.

Land & Feedstock Productivity

1000-acre benchmark. Screen first. Size later.

Land Productivity

Napier dominates on a whole-green-biomass basis.

Integrated Residues

Sugarcane becomes stronger where mill residues are genuinely available.

Dry Residues

Collection, pretreatment and competing use often matter more than theoretical methane potential.

Project Discipline

Use district / farm data before DPR or performance guarantees.

Pretreatment & Digestion

Prepare the feed. Protect the biology.

1

Receive & Qualify

Weigh, sample, inspect and reject outside the feed envelope.

2

Prepare

Size reduction, contaminant removal, homogenisation and blend control.

3

Stabilise Biology

Feed ramp, HRT / OLR, mixing, temperature, pH and VFA control.

4

Design for Upset

Redundancy, bypass, buffer volume and safe recovery strategy.

Why it matters: poor upstream preparation becomes downstream foaming, scum, unstable OLR, equipment wear, lower methane yield and unplanned downtime.

Pretreatment & Feed Preparation

Uniform particle size, contaminant removal, slurry consistency, temperature and maintainability.

Digester Design

HRT, OLR, temperature, mixing, pH / alkalinity, inhibition control and biological buffer.

Gas Upgrading, Reliability & Digital

Recover the molecule. Protect uptime.

PSA / VPSA

High-purity separation with recovery and cycle optimisation.

Membrane

Compact modular upgrading with staged recovery and slip control.

Water Scrubbing

Robust absorption route where water and utilities support the case.

H₂S + Drying

Protect downstream upgrading, analyser and compression systems.

Compression

Final pressure, cooling, custody metering and delivery integration.

Digital Controls

PLC / SCADA, historian, alarms, event logs, dashboards and remote diagnostics.

In-House Technology Base: selected CBG purification / upgrading systems can be supported through in-house manufacturing capability.

Gas Upgrading

H₂S and moisture conditioning, methane recovery, low slip, power and product quality.

Mechanical Reliability

Maintainability, critical redundancy, condition monitoring and lifecycle asset performance.

Circularity & Performance Assurance

Close the loop. Contract the outcome.

Mechanical completion is not plant success. Acceptance demonstrates stable biology, saleable CBG, agreed recovery, product quality, utility consumption and availability through a transparent PGTR methodology.

Clean Gas Stream

Anaerobic Digestion
Raw Biogas
Gas Cleaning & Upgrading
Compression
CBG
Transportation / CGD / Industry

Circular Stream

Digestate
Nutrient Recovery
Organic Fertiliser
Agriculture

Saleable CBG

kg/day at agreed feed envelope

Product Quality

CH₄ and contaminant limits

Methane Recovery

Recovery % and slip limit

Specific Power

kWh/kg or Nm³ CBG

Plant Availability

Sustained uptime commitment

Digestate

Compliant, manageable output

Digestate Management

Mass balance, dewatering, FOM / LFOM compliance, logistics and realistic revenue.

EPC Performance Guarantee

Guarantees tied to defined feedstock, measured output, recovery, utilities and sustained availability.

Let's discuss your project.

Share your feedstock, site and offtake context — we'll respond with a feasibility-first perspective.